Key Projects
Emergency Repairs
Shire of Manjimup
Project Date 2025

Keeping One Tree Bridge Open for the Manjimup Community

The Project

A routine inspection by Main Roads WA uncovered serious deterioration on the historic One Tree Bridge — putting it at risk of closure. Asset Worx was engaged to deliver an emergency solution that would stabilise the structure fast while keeping the road network moving.

Working alongside BG&E Engineers, the Shire of Manjimup, Main Roads WA and our dive team, we designed an innovative propping methodology that avoided pontoons or riverbed support, reduced safety risks and saved a week on the program.

Our team safely installed a custom steel-beam support system, enabling full structural repairs without shutting down the bridge.

The Result?

✔️ Bridge stabilised

✔️ Repairs completed

✔️ No closures or load limits

✔️ Community connectivity maintained

Another example of Asset Worx delivering practical, engineered solutions in complex conditionspport of our dive team.

View our hard work in action

Our Projects

Asset Worx (formerly Timber Insight) was engaged by the Shire of Denmark to undertake routine and preventative maintenance on several...

Asset Worx (formerly Timber Insight) was engaged to undertake emergency repairs and temporary propping installation to one of the shires...

Cookies

This site uses cookies to offer you a better browsing experience.